Tormach will be closed on Friday, March 29th in celebration of Good Friday. We will reopen at 8 am CST on Monday, April 1st.

Loading...

SIMPLE DRILLING CYCLE (G82)

The G82 cycle is intended for drilling.

Program: G82 X~ Y~ Z~ A~ R~ L~ P~

The G82 cycle is as follows:

  • Step 1: Preliminary canned cycle motion.
  • Step 2: Move the Z-axis only at the current feed rate to the Z position.
  • Step 3: Dwell for the P number of seconds.
  • Step 4: Dwell for the P number of seconds.